Davis-Bacon wage rates · Washington
Spokane County building construction wage rates
Federal prevailing wage rates for building construction in Spokane County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260114
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 45
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260114, Mod 2
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0001-021 06/01/2025 | $39.57 | $20.50 | $60.07 |
| CARPENTER | CARP0059-018 06/01/2025 | $44.21 | $17.28 | $61.49 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0072-007 06/01/2025 | $40.89 | $18.64 | $59.53 |
| DRYWALL FINISHER/TAPER | PAIN0427-001 07/01/2025 | $37.46 | $18.42 | $55.88 |
| DRYWALL HANGER | CARP0059-019 06/01/2025 | $44.21 | $17.28 | $61.49 |
| ELECTRICIAN | ELEC0073-013 07/01/2025 | $49.55 | $19.09 | $68.64 |
| ELEVATOR MECHANIC | SUWA2018-014 03/01/2024 | $53.78 | $22.86 | $76.64 |
| GLAZIER | SUWA2018-014 03/01/2024 | $23.07 | $3.99 | $27.06 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | ASBE0007-007 06/01/2025 | $75.37 | $18.82 | $94.19 |
| IRONWORKER | IRON0014-011 07/07/2025 | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | LABO0252-017 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: COMMON OR GENERAL | LABO0238-041 06/01/2025 | $37.13 | $16.90 | $54.03 |
| LABORER: CONCRETE SAW CHAIN | SUWA2018-014 03/01/2024 | $35.03 | $10.86 | $45.89 |
| LABORER: FIRE WATCH | LABO0335-007 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: FORM STRIPPING | LABO0242-015 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | LABO0238-042 06/01/2025 | $40.21 | $16.90 | $57.11 |
| LABORER: HOD CARRIER | LABO0238-044 06/01/2025 | $38.05 | $16.75 | $54.80 |
| LABORER: JACKHAMMER | LABO0242-018 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUWA2018-014 03/01/2024 | $29.14 | $12.05 | $41.19 |
| LABORER: NOZZLE PERSON | LABO0242-020 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | LABO0238-043 06/01/2025 | $37.80 | $16.90 | $54.70 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (45,000 GW & UNDER) | ENGI0302-115 06/01/2025 | $39.71 | $23.40 | $63.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (45,000 GW TO 110,000 GW) | ENGI0302-115 06/01/2025 | $40.05 | $23.40 | $63.45 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 110,000 GW) | ENGI0302-115 06/01/2025 | $40.39 | $23.40 | $63.79 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-014 03/01/2024 | $40.53 | $9.56 | $50.09 |
| OPERATOR: CONCRETE PUMP | UAVGWA0001 03/01/2024 | $52.92 | $22.63 | $75.55 |
| OPERATOR: DRILL | UAVGWA0002 03/01/2024 | $56.42 | $21.15 | $77.57 |
| OPERATOR: OILER | SUWA2018-014 03/01/2024 | $36.39 | $16.62 | $53.01 |
| PAINTER | PAIN0300-003 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | PLUM0598-001 06/01/2025 | $65.20 | $34.91 | $100.11 |
| PLUMBER | PLUM0044-003 06/01/2025 | $47.15 | $27.20 | $74.35 |
POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $38.17 | $23.40 | $61.57 |
POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $39.31 | $23.40 | $62.71 |
POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $39.51 | $23.40 | $62.91 |
POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $39.71 | $23.40 | $63.11 |
POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $40.05 | $23.40 | $63.45 |
POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $40.39 | $23.40 | $63.79 |
POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $42.36 | $23.40 | $65.76 |
POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | ENGI0302-134 06/01/2025 | $43.34 | $23.40 | $66.74 |
| ROOFER, EXCLUDES METAL ROOFS | ROOF0189-007 07/01/2025 | $35.64 | $14.89 | $50.53 |
| SHEETMETAL WORKER (INCLUDING METAL ROOFING) | SHEE0055-011 06/01/2025 | $45.83 | $27.92 | $73.75 |
| TILE FINISHER | BRWA0001-023 06/01/2025 | $27.26 | $11.99 | $39.25 |
| TILE SETTER | BRWA0001-023 06/01/2025 | $36.35 | $14.57 | $50.92 |
| TRUCK DRIVER: CONCRETE TRUCK | TEAM0174-009 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK | TEAM0690-001 06/01/2024 | $37.22 | $20.93 | $58.15 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Spokane County?
What is the Davis-Bacon rate for plumbers on building work in Spokane County?
What is the Davis-Bacon rate for carpenters on building work in Spokane County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260114
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.