Davis-Bacon wage rates · Washington
Yakima County building construction wage rates
Federal prevailing wage rates for building construction in Yakima County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260119
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 43
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260119, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0001-021 06/01/2025 | $39.57 | $20.50 | $60.07 |
| CARPENTER | CARP0059-018 06/01/2025 | $44.21 | $17.28 | $61.49 |
| CEMENT MASON/CONCRETE FINISHER | SUWA2018-019 03/01/2024 | $28.26 | $9.29 | $37.55 |
| ELECTRICIAN | ELEC0112-012 06/01/2025 | $60.00 | $27.78 | $87.78 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | ASBE0007-007 06/01/2025 | $75.37 | $18.82 | $94.19 |
| IRONWORKER | IRON0086-006 07/07/2025 | $57.94 | $34.52 | $92.46 |
| LABORER, MASON TENDER BRICK | LABO0252-017 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: COMMON OR GENERAL | SUWA2018-019 03/01/2024 | $27.94 | $7.89 | $35.83 |
| LABORER: CONCRETE SAW CHAIN | SUWA2018-019 03/01/2024 | $35.03 | $10.86 | $45.89 |
| LABORER: FIRE WATCH | LABO0335-007 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: FORM STRIPPING | LABO0242-015 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | UAVGWA0008 03/01/2024 | $45.01 | $18.51 | $63.52 |
| LABORER: HOD CARRIER | LABO0335-012 06/01/2025 | $48.14 | $15.60 | $63.74 |
| LABORER: JACKHAMMER | LABO0242-018 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUWA2018-019 03/01/2024 | $26.66 | $9.76 | $36.42 |
| LABORER: NOZZLE PERSON | LABO0242-020 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | SUWA2018-019 03/01/2024 | $32.17 | $11.49 | $43.66 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUWA2018-019 03/01/2024 | $37.76 | $7.02 | $44.78 |
| OPERATOR: BLADE FINISH (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-099 06/13/2025 | $59.88 | $27.57 | $87.45 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-019 03/01/2024 | $40.53 | $9.56 | $50.09 |
| OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-099 06/13/2025 | $59.23 | $27.57 | $86.80 |
| OPERATOR: CONCRETE PUMP | UAVGWA0001 03/01/2024 | $52.92 | $22.63 | $75.55 |
| OPERATOR: CRANE | UAVGWA0004 03/01/2024 | $53.35 | $17.57 | $70.92 |
| OPERATOR: DRILL | UAVGWA0002 03/01/2024 | $56.42 | $21.15 | $77.57 |
| OPERATOR: GRADER/BLADE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-099 06/13/2025 | $60.67 | $27.57 | $88.24 |
| OPERATOR: LOADER: OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-104 06/01/2025 | $60.67 | $27.57 | $88.24 |
| OPERATOR: LOADER: OVERHEAD UNDER 6 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-104 06/01/2025 | $59.88 | $27.57 | $87.45 |
| OPERATOR: MECHANIC | SUWA2018-019 03/01/2024 | $40.77 | $15.91 | $56.68 |
| OPERATOR: OILER | SUWA2018-019 03/01/2024 | $36.39 | $16.62 | $53.01 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-099 06/13/2025 | $60.67 | $27.57 | $88.24 |
| OPERATOR: ROLLER | SUWA2018-019 03/01/2024 | $42.04 | $12.79 | $54.83 |
| PAINTER | PAIN0300-003 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | PLUM0598-001 06/01/2025 | $65.20 | $34.91 | $100.11 |
| PLUMBER | SUWA2018-019 03/01/2024 | $47.74 | $28.52 | $76.26 |
| ROOFER, EXCLUDES METAL ROOFS | ROOF0153-007 02/01/2024 | $48.01 | $16.44 | $64.45 |
| SCAFFOLD BUILDER | LABO0335-021 06/01/2025 | $44.06 | $15.60 | $59.66 |
| SHEETMETAL WORKER (INCLUDING METAL ROOFING) | SHEE0055-010 06/01/2025 | $50.00 | $28.41 | $78.41 |
| SPRINKLER FITTER | SUWA2018-019 03/01/2024 | $25.80 | $8.32 | $34.12 |
| TILE FINISHER | BRWA0001-023 06/01/2025 | $27.26 | $11.99 | $39.25 |
| TILE SETTER | BRWA0001-023 06/01/2025 | $36.35 | $14.57 | $50.92 |
| TRUCK DRIVER: CONCRETE TRUCK | TEAM0174-009 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | TEAM0589-002 06/01/2025 | $54.68 | $27.52 | $82.20 |
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | TEAM0589-002 06/01/2025 | $53.84 | $27.52 | $81.36 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Yakima County?
What is the Davis-Bacon rate for plumbers on building work in Yakima County?
What is the Davis-Bacon rate for carpenters on building work in Yakima County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260119
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.