Davis-Bacon wage rates · Pennsylvania
Philadelphia County building construction wage rates
Federal prevailing wage rates for building construction in Philadelphia County, Pennsylvania, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- PA20260003
- Modification
- 2
- Published
- October 1, 2026
- Classifications
- 63
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Pennsylvania prevailing wage for how the two fit together.
WD PA20260003, Mod 2
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | ASBE0014-001 05/01/2025 | $60.84 | $48.38 | $109.22 |
| BOILERMAKER | BOIL0013-001 01/01/2025 | $55.00 | $35.48 | $90.48 |
| BRICKLAYER | BRPA0001-006 05/01/2024 | $48.70 | $31.61 | $80.31 |
| CARPENTER/LATHER | CARP0158-001 05/01/2026 | $57.72 | $30.39 | $88.11 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0592-011 05/01/2025 | $48.70 | $32.26 | $80.96 |
| DRYWALL FINISHER/TAPER | PAIN0021-012 05/01/2024 | $42.25 | $32.16 | $74.41 |
| ELECTRICIAN | ELEC0098-003 05/04/2026 | $75.05 | $47.02 | $122.07 |
| ELECTRICIAN (SOUND AND COMMUNICATION TECHNICIAN) (INSTALLATION OF VOICE DATA, IT NETWORK, WIFI)) | ELEC0098-014 05/04/2026 | $69.62 | $38.39 | $108.01 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0005-001 01/01/2025 | $71.85 | $38.44 | $110.29 |
| FLOOR LAYER: CARPET | CARP0251-001 05/01/2025 | $56.51 | $32.39 | $88.90 |
| GLAZIER | PAIN0252-006 05/01/2022 | $46.09 | $34.83 | $80.92 |
| IRONWORKER: REINFORCING Footnote NOTE below | IRON0405-002 07/01/2025 | $50.39 | $36.05 | $86.44 |
| IRONWORKER: RIGGER AND MACHINERY MOVER Footnote NOTE below | IRON0405-004 07/01/2025 | $46.86 | $36.05 | $82.91 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | IRON0401-002 07/01/2025 | $56.50 | $45.30 | $101.80 |
| LABORER: ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE REMOVAL, LEAD BASED PAINT REMOVAL | LABO0332-002 05/01/2025 | $41.00 | $27.04 | $68.04 |
LABORER: GROUP 1 BUILDING SITE WORK; STRIPPING AND DISMANTLING CONCRETE FORM WORK; LOADING, UNLOADING, CARRYING AND HANDLING OF ALL REINFORCED STEEL AND STEEL MESH; HANDLING LUMBER AND OTHER BUILDING ...LABORER: GROUP 1 BUILDING SITE WORK; STRIPPING AND DISMANTLING CONCRETE FORM WORK; LOADING, UNLOADING, CARRYING AND HANDLING OF ALL REINFORCED STEEL AND STEEL MESH; HANDLING LUMBER AND OTHER BUILDING MATERIALS; OPERATING JACKHAMMERS, PAVING BREAKERS AND ALL OTHER PNEUMATIC TOOLS; BUILDING SCAFFOLDS; RAKING, SHOVELING AND TAMPING OF ASPHALT; SPADING AND CONCRETE PIT WORK; GRADING; FORM PINNING; SHORING; DEMOLITION EXCEPT BURNERS; LAYING CONDUITS AND DUCTS; SHEATHING; LAGGING; LAYING NON-METALLIC PIPE AND CAULKING; ALL OTHER TYPES OF LABORERS; POURING CONCRETE; OPERATING VIBRATOR; FREE AIR TUNNELS: MINERS | LABO0332-001 05/01/2025 | $39.10 | $26.69 | $65.79 |
| LABORER: GROUP 10 WELDERS AND BURNERS | LABO0332-001 05/01/2025 | $40.93 | $26.69 | $67.62 |
| LABORER: GROUP 11 MASON TENDER | LABO0332-001 05/01/2025 | $39.50 | $26.69 | $66.19 |
| LABORER: GROUP 2 POWER BUGGIES; BURNERS ON DEMOLITION | LABO0332-001 05/01/2025 | $39.20 | $26.69 | $65.89 |
| LABORER: GROUP 3 WAGON DRILL OPERATOR (SINGLE) | LABO0332-001 05/01/2025 | $39.25 | $26.69 | $65.94 |
| LABORER: GROUP 4 POWDERMEN; WAGON DRILL OPERATOR (MULTIPLE); CIRCULAR CAISSON EXCAVATION; UNDERPINNING EXCAVATION | LABO0332-001 05/01/2025 | $39.40 | $26.69 | $66.09 |
| LABORER: GROUP 5 CAISSON BOTTOM MAN | LABO0332-001 05/01/2025 | $39.45 | $26.69 | $66.14 |
| LABORER: GROUP 6 YARD WORKERS | LABO0332-001 05/01/2025 | $39.24 | $26.69 | $65.93 |
| LABORER: GROUP 7 TRACKMEN; BRAKEMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER MEN IN FREE AIR TUNNELS | LABO0332-001 05/01/2025 | $40.38 | $26.69 | $67.07 |
| LABORER: GROUP 8 FORM SETTERS | LABO0332-001 05/01/2025 | $40.53 | $26.69 | $67.22 |
| LABORER: GROUP 9 MINERS BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATORS | LABO0332-001 05/01/2025 | $40.68 | $26.69 | $67.37 |
| LANDSCAPE LABORER FARM TRACTOR DRIVER, HYDROSEEDER NOZZLEMAN AND MULCHER NOZZLEMAN Footnote A below | LABO0413-004 05/01/2025 | $31.73 | $23.72 | $55.45 |
| MARBLE FINISHER | MARB0001-003 05/01/2021 | $25.10 | $20.75 | $45.85 |
| MARBLE SETTER | MARB0003-002 05/01/2021 | $44.90 | $30.75 | $75.65 |
| MASON - STONE | BRPA0001-011 05/01/2024 | $48.40 | $31.95 | $80.35 |
| MILLWRIGHT | CARP0219-005 05/01/2026 | $55.54 | $40.47 | $96.01 |
| PAINTER: BRUSH, ROLLER | PAIN0021-001 05/01/2021 | $41.24 | $28.10 | $69.34 |
| PAINTER: SPRAY, STEEL AND SWING | PAIN0021-001 05/01/2021 | $42.49 | $28.10 | $70.59 |
| PILEDRIVERMAN | CARP0474-004 05/01/2025 | $48.25 | $44.92 | $93.17 |
| PLASTERER | PLAS0592-014 05/01/2025 | $45.08 | $33.59 | $78.67 |
| PLUMBER | PLUM0690-002 05/01/2026 | $73.73 | $39.86 | $113.59 |
| POINTER, CAULKER AND CLEANER | BRPA0001-015 05/01/2024 | $50.00 | $30.70 | $80.70 |
POWER EQUIPMENT OPERATOR: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO...POWER EQUIPMENT OPERATOR: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT | ENGI0542-002 05/01/2025 | $54.52 | $34.49 | $89.01 |
POWER EQUIPMENT OPERATOR: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER F...POWER EQUIPMENT OPERATOR: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER | ENGI0542-002 05/01/2025 | $57.52 | $35.38 | $92.90 |
POWER EQUIPMENT OPERATOR: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, G...POWER EQUIPMENT OPERATOR: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), BOBCAT. SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEER SAW TYPE MACHINES(OTHER THAN THAN HAND HELD TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL) MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | ENGI0542-002 05/01/2025 | $54.27 | $34.42 | $88.69 |
POWER EQUIPMENT OPERATOR: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER ...POWER EQUIPMENT OPERATOR: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER | ENGI0542-002 05/01/2025 | $57.29 | $35.29 | $92.58 |
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MA...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS ELEVATOR OPERATOR (NEW CONSTRUCTION) MACHINE SIMILAR TO THE ABOVE,INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | ENGI0542-002 05/01/2025 | $50.18 | $33.22 | $83.40 |
POWER EQUIPMENT OPERATOR: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE ...POWER EQUIPMENT OPERATOR: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICATIONS AND MACHIINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | ENGI0542-002 05/01/2025 | $49.88 | $33.13 | $83.01 |
POWER EQUIPMENT OPERATOR: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILA...POWER EQUIPMENT OPERATOR: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | ENGI0542-002 05/01/2025 | $48.16 | $32.62 | $80.78 |
POWER EQUIPMENT OPERATOR: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS...POWER EQUIPMENT OPERATOR: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | ENGI0542-002 05/01/2025 | $47.17 | $32.33 | $79.50 |
| ROOFER: COMPOSITION Footnote A below | ROOF0030-001 05/01/2022 | $41.48 | $33.37 | $74.85 |
| ROOFER: SHINGLES Footnote A below | ROOF0030-001 05/01/2022 | $31.25 | $21.75 | $53.00 |
| ROOFER: SLATE AND TILE | ROOF0030-001 05/01/2022 | $34.25 | $21.75 | $56.00 |
| SHEET METAL WORKER | SHEE0019-008 05/01/2025 | $62.62 | $50.66 | $113.28 |
| SHEET METAL WORKER (SIGN MAKERS & HANGERS) | SHEE0019-023 07/15/2024 | $33.89 | $24.25 | $58.14 |
| SPRINKLER FITTER | SFPA0692-001 01/01/2025 | $66.22 | $34.25 | $100.47 |
| STEAMFITTER | PLUM0420-008 05/01/2025 | $72.52 | $44.58 | $117.10 |
| TERRAZZO FINISHER | MARB0001-003 05/01/2021 | $27.03 | $20.58 | $47.61 |
| TERRAZZO WORKER/SETTER | MARB0003-002 05/01/2021 | $48.01 | $28.67 | $76.68 |
| TILE FINISHER | MARB0001-003 05/01/2021 | $25.10 | $20.75 | $45.85 |
| TILE SETTER | BRPA0001-008 05/01/2024 | $51.36 | $30.02 | $81.38 |
| TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE), 11/2 TON AND UNDER VEHICLES Footnote A, B below | TEAM0107-001 05/01/2025 | $37.57 | $23.32 | $60.89 |
TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 2 TRUCK DRIVER OVER 11/2 TONS, DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS AND DUMCRETE TYPE VEHICLE, ASPHALT DISTRIBUTORS, FA...TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 2 TRUCK DRIVER OVER 11/2 TONS, DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS AND DUMCRETE TYPE VEHICLE, ASPHALT DISTRIBUTORS, FARM TRACTORS WHEN USED FOR TRANSPORTATION, STAKE BODY TRUCK (TANDEM) | TEAM0107-001 05/01/2025 | $37.67 | $23.32 | $60.99 |
| TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOWBED TRAILERS Footnote A, B below | TEAM0107-001 05/01/2025 | $37.92 | $23.32 | $61.24 |
| TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 1 - STAKE BODY TRUCK (SINGLE AXLE), DUMPSTER Footnote A, B below | TEAM0107-001 05/01/2025 | $37.57 | $23.32 | $60.89 |
TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 2 - DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, AND DUMPCRETE TYPE VEHICLES, ASPHAL...TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 2 - DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS, FARM TRACTOR WHEN USED FOR TRANSPORTATION, STAKE BODY TRUCK (TANDEM) | TEAM0107-001 05/01/2025 | $37.67 | $23.32 | $60.99 |
| TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 3 - EUCLID TYPE, OFF-HIGHWAY EQUIPMENT OR BELL DUMP TRUCKS AND DOUBLE HITCHED EQUIPMENT, STADDLE (ROSS) CARRIER, LOW-BED TRAILERS Footnote A, B below | TEAM0107-001 05/01/2025 | $37.92 | $23.32 | $61.24 |
| WINDOW TINTER | PAIN0252-001 06/01/2021 | $25.02 | $13.06 | $38.08 |
Footnotes in PA20260003 (9)
- ELEV0005-001 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
- ELEV0005-001 B: EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY
- ENGI0542-002 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY
- IRON0405-002 NOTE: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY
- IRON0405-004 NOTE: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY
- LABO0413-004 A: PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY
- ROOF0030-001 A: PAID HOLIDAY: ELECTION DAY
- TEAM0107-001 A: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS.
- TEAM0107-001 B: PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Philadelphia County?
What is the Davis-Bacon rate for plumbers on building work in Philadelphia County?
What is the Davis-Bacon rate for carpenters on building work in Philadelphia County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with PA20260003
Other counties: all Pennsylvania counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.