Davis-Bacon wage rates · Pennsylvania

Philadelphia County highway construction wage rates

Federal prevailing wage rates for highway construction in Philadelphia County, Pennsylvania, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
PA20260004
Modification
8
Published
October 1, 2026
Classifications
60
Other types here
Building, Residential, Heavy

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Pennsylvania prevailing wage for how the two fit together.

WD PA20260004, Mod 8

Make a WH-347 with these rates
Published October 1, 2026 60 classifications Covers 5 counties Types: Heavy, Highway Source: SAM.gov

Scope as published: Heavy Construction · Highway Construction

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in PA20260004 Mod 8, published 10/01/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BOILERMAKER BOIL0013-003
01/01/2025
$55.00 $35.48 $90.48
CARPENTER Footnote A below CARP0255-006
05/01/2025
$57.36 $30.09 $87.45
CEMENT MASON/CONCRETE FINISHER PLAS0592-008
05/01/2025
$46.55 $32.66 $79.21
ELECTRICIAN (BUCKS COUNTY (AREA EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVA...ELECTRICIAN (BUCKS COUNTY (AREA EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 53
ELEC0269-001
01/05/2026
$63.82 $41.99 $105.81
ELECTRICIAN (BUCKS COUNTY (EAST ROCK HILL, WEST ROCK HILL, MILFORD AND RICHLAND TOWSHIPS IN THEIR ENTIRETY AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS WEST OF A LINE FOLLOWING STATE HIGHWAY ...ELECTRICIAN (BUCKS COUNTY (EAST ROCK HILL, WEST ROCK HILL, MILFORD AND RICHLAND TOWSHIPS IN THEIR ENTIRETY AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS WEST OF A LINE FOLLOWING STATE HIGHWAY 212 FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 ALONG 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068 AND ALONG 09068 TO STATE HIGHWAY 313) MONTGOMERY COUNTY(UPPER HANOVER TWP.IN ITS ENTIRETY))
ELEC0375-001
06/01/2025
$50.00 $25.93 $75.93
ELECTRICIAN (BUCKS COUNTY (HILLTOWN AND NEW BRITAIN TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF TELFORD BOROUGH NORTHEAST OF COUNTY LINE ROAD (MAIN STREET) AND BOUNDED BY WEST ROCK HILL AND HILLTOWN ...ELECTRICIAN (BUCKS COUNTY (HILLTOWN AND NEW BRITAIN TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF TELFORD BOROUGH NORTHEAST OF COUNTY LINE ROAD (MAIN STREET) AND BOUNDED BY WEST ROCK HILL AND HILLTOWN TOWNSHIP THAT PORTION OF DUBLIN BOROUGH WEST OF STATE HIGHWAY 313, AND THAT PORTION OF DOYLESTOWN AND WARRINGTON TOWNSHIPS AND DOYLESTOWN BOROUGH NORTHWEST OF A LINE FOLLOWING U.S. HIGHWAY 611 SOUTH FROM ROUTE 09064 TO THE SPUR OF ROUTE 270, AND PROCEEDING NORTHWEST ALONG THE SPUR TO ROUTE 3
ELEC0380-001
05/05/2025
$58.63 $46.58 $105.21
ELECTRICIAN (BUCKS COUNTY (PLUMSTEAD, BEDMINISTER, TINICUM, NOCKAMIXON, BRIDGETON AND DURHAM TOWNSHIPS IN THEIR ENTIREY, AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS EAST OF A LINE FOLLOWING ...ELECTRICIAN (BUCKS COUNTY (PLUMSTEAD, BEDMINISTER, TINICUM, NOCKAMIXON, BRIDGETON AND DURHAM TOWNSHIPS IN THEIR ENTIREY, AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS EAST OF A LINE FOLLOWING STATE HIGHWAY 412, FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068, AND ALONG 09068 TO STATE HIGHWAY 313. ALSO INCLUDED IS THAT PORTION OF DUBLIN BOROUGH EAST OF STATE HIGHWAY 313)
ELEC0102-003
06/02/2025
$65.43 $42.20 $107.63
ELECTRICIAN (BUCKS COUNTY: STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE ...ELECTRICIAN (BUCKS COUNTY: STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HUMEVILLE ROAD, EAST ON HUMEVILLE ROAD TO ROUTE 333, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252, CONTINUE NORTH ON SPUR 252 TO ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 232, NORTH ON TR 532
ELEC0098-001
05/04/2026
$75.05 $47.02 $122.07
ELECTRICIAN (CHESTER (COATESVILLE, HONEY BROOK, SOUTH COVENTY, VALLEY, WALLACE, WARWICH, WEST BRANDYWINE, WEST CLAN, AND WEST NANTMEAL TWPS); AND MONTGOMERY (DOUGLAS, POTTSTOWN, UPPER POTTSGROVE, AND ...ELECTRICIAN (CHESTER (COATESVILLE, HONEY BROOK, SOUTH COVENTY, VALLEY, WALLACE, WARWICH, WEST BRANDYWINE, WEST CLAN, AND WEST NANTMEAL TWPS); AND MONTGOMERY (DOUGLAS, POTTSTOWN, UPPER POTTSGROVE, AND WEST POTTSGROVE, TWPS) COUNTIES)
ELEC0743-001
09/01/2025
$46.02 $27.98 $74.00
ELECTRICIAN (CHESTER COUNTY (THE PORTION OF SADSBURY AND WEST SADSBURY TOWNSHIP NORTH OF U.S. HIGHWAY 30)) ELEC0743-007
09/01/2025
$46.02 $27.98 $74.00
ELECTRICIAN (DELAWARE COUNTY:(THAT PORTION SOUTH OF U.S. HIGHWAY NO. 1 AND WEST OF U.S. HIGHWAY NO. 202) CHESTER COUNTY (THAT PORTION SOUTH AND EAST OF U. S. HIGHWAY 1)) ELEC0313-003
06/01/2011
$35.00 $23.70 $58.70
ELECTRICIAN (DELAWARE COUNTY (THE PORTION SOUTH OF U.S. HIGHWAY 30 AND NORTH OF THAT PART U.S. HIGHWAY 1 BETWEEN U.S. HIGHWAY 202 AND THE CHESTER COUNTY LINE, AND EAST OF THAT PART OF U.S. HIGHWAY 202...ELECTRICIAN (DELAWARE COUNTY (THE PORTION SOUTH OF U.S. HIGHWAY 30 AND NORTH OF THAT PART U.S. HIGHWAY 1 BETWEEN U.S. HIGHWAY 202 AND THE CHESTER COUNTY LINE, AND EAST OF THAT PART OF U.S. HIGHWAY 202 BETWEEN U.S. HIGHWAY 1 AND THE DELAWARE LINE, AND WEST OF A LINE EXTENDING FROM MONTGOMERY COUNTY ALONG STATE ROUTE 320 TO MAPLE, THEN ALONG THE SPRINGFIELD ROAD TO SAXER AVENUE, ALONG SAXER AVENUE TO POWELL ROAD; ALONG POWELL ROAD TO STATE HIGHWAY 420; ALONG 420 AND CONTINUING IN A STRAIGHT LINE
ELEC0654-001
06/02/2025
$52.71 $39.97 $92.68
IRONWORKER: MONTGOMERY COUNTY (ANISE, BERGUY, CONGO, DOUGLAS, EAST GREENFIELD, EAST LIMERICK, EAST SLAFORD, EAST ZIEGLERVILLE, ENGLEVILLE, FAGLEYSVILLE, FORD, GILBERTSVILLE, GREEN LANE, HANOVER, NEW P...IRONWORKER: MONTGOMERY COUNTY (ANISE, BERGUY, CONGO, DOUGLAS, EAST GREENFIELD, EAST LIMERICK, EAST SLAFORD, EAST ZIEGLERVILLE, ENGLEVILLE, FAGLEYSVILLE, FORD, GILBERTSVILLE, GREEN LANE, HANOVER, NEW PERKSIONENVILLE, NIATO, PALM, OBELISH, PENNSBURG, PERKIOMEN, POTTSTOWN, ROYERFORED, ROYTOWN, SAMMAMANSVILLE, TYLERPORT, UPPER HANOVER, UPPER POTTSGROVE, UPPER WODALL, WEST LIMERICK, WEST SALFORD, AND WEST ZIEGLERVILLE TOWNSHIPS))
IRON0404-023
07/01/2024
$37.26 $32.63 $69.89
IRONWORKER: REINFORCING (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) Footnote NOTE below IRON0405-001
07/01/2025
$47.80 $36.05 $83.85
IRONWORKER: REINFORCING (PHILADELPHIA COUNTY) Footnote NOTE below IRON0405-001
07/01/2025
$50.39 $36.05 $86.44
IRONWORKER: RIGGER AND MACHINERY MOVER: (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) Footnote NOTE below IRON0405-003
07/01/2025
$44.77 $36.05 $80.82
IRONWORKER: RIGGER AND MACHINERY MOVER: (PHILADELPHIA COUNTY) Footnote NOTE below IRON0405-003
07/01/2025
$46.86 $36.05 $82.91
IRONWORKER: STRUCTURAL AND ORNAMENTAL (BUCKS (INCLUDES THE TOWNS OF BENSALEM, BREADYSVILLE, BRISTOL CHURCHVILLE, CORNWELLS HEIGHTS, DAVISVILLE, EDDINGTON, FEASTERVILLE, HARTSVILLE, JOHNSVILLE, LINE LE...IRONWORKER: STRUCTURAL AND ORNAMENTAL (BUCKS (INCLUDES THE TOWNS OF BENSALEM, BREADYSVILLE, BRISTOL CHURCHVILLE, CORNWELLS HEIGHTS, DAVISVILLE, EDDINGTON, FEASTERVILLE, HARTSVILLE, JOHNSVILLE, LINE LEXINGTON, NESHAMINY, SOUTHAMPTON, TRADESVILLE, TREVOSE, UNIONVILLE, WARMINSTER, AND WARRINGTON): DELAWARE (NORTH OF A LINE RUNNING ALONG STATE RT 352 TO RIGHT ON STATE RT 291 TO STATE LINE); CHESTER (INCLUDES THE TOWNS OF ALDHAM, ANSELMA, BACTON, BERWYN, CEDAR HOLLOW, CHARLESTOWN, CHESTER SPRINGS, C
IRON0401-001
07/01/2025
$56.50 $45.30 $101.80
IRONWORKER: STRUCTURAL, ORNAMENTAL, AND REINFORCING (CHESTER (REMAINDER OF COUNTY), AND DELAWARE (REMAINDER OF COUNTY) COUNTIES) Footnote NOTE below IRON0451-004
07/01/2024
$41.10 $35.85 $76.95
LABORER: GROUP 1 YARDWORK LABORERS; SCALE MIXERMEN; BURNERMEN, FEEDERS; DUSTMEN LABO0057-001
05/01/2025
$39.80 $27.13 $66.93
LABORER: GROUP 10 CIRCULAR CAISSONS (WHERE AN EXCAVATION FOR CIRCULAR CAISSONS ARE DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE LEVEL ADJACENT TO THE STARTING POINT OF THE CAISSON HOLE, AT GROUND LE...LABORER: GROUP 10 CIRCULAR CAISSONS (WHERE AN EXCAVATION FOR CIRCULAR CAISSONS ARE DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE LEVEL ADJACENT TO THE STARTING POINT OF THE CAISSON HOLE, AT GROUND LEVEL, FOR THE MEN WORKING IN THE BOTTOM); WELDERS, BURNERS & AIR TUGGERS
LABO0057-001
05/01/2025
$40.40 $27.14 $67.54
LABORER: GROUP 11 POWDERMAN; MULTIPLE WAGON DRILL OPERATOR LABO0057-001
05/01/2025
$40.20 $27.14 $67.34
LABORER: GROUP 12 TOXIC/HAZARDOUS WASTE HANDLER LABO0057-001
05/01/2025
$43.90 $27.14 $71.04
LABORER: GROUP 13 WAGON DRILL/HYDRAULIC TRACK DRILL OPERATOR LABO0057-001
05/01/2025
$40.50 $27.14 $67.64
LABORER: GROUP 2 GENERAL LABORER; ASPHALT SHOVELERS; SHEETING, SHORING & LAGGING LABORERS; STONE, GRANITE & ARTIFICIAL STONE SETTING LABORER; HOD CARRIERS; SCAFFOLD BUILDERS; RELIEF JOINTS & APPROACH ...LABORER: GROUP 2 GENERAL LABORER; ASPHALT SHOVELERS; SHEETING, SHORING & LAGGING LABORERS; STONE, GRANITE & ARTIFICIAL STONE SETTING LABORER; HOD CARRIERS; SCAFFOLD BUILDERS; RELIEF JOINTS & APPROACH SLABS; ASSEMBLING & PLACING GABIONS; PNEUMATIC TOOL LABORERS; CONCRETE FORMS & STRIPPING LABORERS; CONCRETE & LUMBER MATERIAL LABORERS; STEEL & STEEL MESH (CARRYING & HANDLING); FORM PINNERS; MORTAR MIXERS; POURING & PLACING CONCRETE; GRADE MEN
LABO0057-001
05/01/2025
$40.00 $27.14 $67.14
LABORER: GROUP 3 VIBRATOR LABORER; FINISH SURFACE ASPHALT RACKERS; JACKHAMMER OPERATORS; PAVING BREAKER OPERATOR; PIPELAYER & CAULKER (ALL JOINTS UP TO WITHIN 5 FEET OF THE BUILDING FOUNDATION LINE); ...LABORER: GROUP 3 VIBRATOR LABORER; FINISH SURFACE ASPHALT RACKERS; JACKHAMMER OPERATORS; PAVING BREAKER OPERATOR; PIPELAYER & CAULKER (ALL JOINTS UP TO WITHIN 5 FEET OF THE BUILDING FOUNDATION LINE); CONDUIT & DUCT LAYERS
LABO0057-001
05/01/2025
$40.00 $27.14 $67.14
LABORER: GROUP 4 FLAGPERSON LABO0057-001
05/01/2025
$34.60 $27.14 $61.74
LABORER: GROUP 5 MINERS LABO0057-001
05/01/2025
$40.65 $27.14 $67.79
LABORER: GROUP 6 WELDERS AND BURNERS LABO0057-001
05/01/2025
$40.70 $27.14 $67.84
LABORER: GROUP 7 MINER BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATOR LABO0057-001
05/01/2025
$40.75 $27.14 $67.89
LABORER: GROUP 8 FORM SETTERS LABO0057-001
05/01/2025
$40.30 $27.14 $67.44
LABORER: GROUP 9 TRACKMEN; BRACKMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER LABORERS IN FREE AIR TUNNELS; UNDERPINNING (WHEN AN UNDERPINNING EXCAVATION IS DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE...LABORER: GROUP 9 TRACKMEN; BRACKMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER LABORERS IN FREE AIR TUNNELS; UNDERPINNING (WHEN AN UNDERPINNING EXCAVATION IS DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE OR WHERE AN EXCAVATION FOR A PIER HOLE OF FIVE FEET SQUARE OR LESS AND EIGHT FEET OR MORE DEEP IS DUG, THE RATE SHALL APPLY ONLY AFTER A DEPTH OF EIGHT FEET IS REACHED, TO THE MEN WORKING IN THE BOTTOM)
LABO0057-001
05/01/2025
$40.15 $27.14 $67.29
LABORER: LANDSCAPING (FARM TRACTOR DRIVER, HYDROSEEDER NOZZLEMAN, MULCHER NOZZLEMAN) Footnote A below LABO0413-005
05/01/2025
$31.73 $23.72 $55.45
LINE CONSTRUCTION: CABLE SPLICER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGH...LINE CONSTRUCTION: CABLE SPLICER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO R
ELEC0269-002
07/07/2025
$68.02 $44.04 $112.06
LINE CONSTRUCTION: CABLE SPLICER (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) ELEC0126-002
06/03/2024
$62.54 $32.92 $95.46
LINE CONSTRUCTION: GROUNDMAN (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) ELEC0126-002
06/03/2024
$37.52 $24.35 $61.87
LINE CONSTRUCTION: GROUNDMAN, TRUCK DRIVER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF...LINE CONSTRUCTION: GROUNDMAN, TRUCK DRIVER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON
ELEC0269-002
07/07/2025
$49.47 $32.03 $81.50
LINE CONSTRUCTION: LINEMAN (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) ELEC0126-002
06/03/2024
$62.54 $32.92 $95.46
LINE CONSTRUCTION: LINEMEN AND HEAVY EQUIPMENT OPERATOR (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CO...LINE CONSTRUCTION: LINEMEN AND HEAVY EQUIPMENT OPERATOR (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09
ELEC0269-002
07/07/2025
$61.84 $40.04 $101.88
LINE CONSTRUCTION: TRUCK DRIVER (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) ELEC0126-002
06/03/2024
$40.65 $25.42 $66.07
LINE CONSTRUCTION: WINCH TRUCK OPERATOR (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) ELEC0126-002
06/03/2024
$43.78 $26.49 $70.27
MILLWRIGHT CARP0219-005
05/01/2026
$55.54 $40.47 $96.01
PAINTER: ALL OTHER WORK PAIN0021-003
02/01/2025
$50.85 $32.05 $82.90
PAINTER: BRIDGE PAIN0021-003
02/01/2025
$61.81 $32.09 $93.90
PILEDRIVERMAN CARP0474-004
05/01/2025
$48.25 $44.92 $93.17
PLASTERER (BUCKS, CHESTER, DELAWARE AND MONTOGMERY COUNTIES) PLAS0592-013
05/01/2023
$39.32 $32.44 $71.76
PLASTERER (PHILADELPHIA COUNTY) PLAS0592-012
05/01/2024
$43.78 $32.89 $76.67
PLUMBER PLUM0690-008
05/01/2026
$73.73 $39.86 $113.59
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHI...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT
Footnote A below
ENGI0542-005
05/01/2024
$53.36 $33.65 $87.01
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER
Footnote A below
ENGI0542-005
05/01/2024
$56.37 $34.53 $90.90
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRI...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADDALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), TOXIC/HAZARDOUS WASTE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICIATION, BOBCAT, SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEET SAW TYPE MACHINES ( OTHER THAN HAND HELD) TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL MACHINE SIMILAR TO THE ABOVE INCLUDIDNG REMOTE CONTROL EQUIPMENT. 3: ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT
Footnote A below
ENGI0542-005
05/01/2024
$53.11 $33.58 $86.69
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE ...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER
Footnote A below
ENGI0542-005
05/01/2024
$56.13 $34.45 $90.58
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT
Footnote A below
ENGI0542-005
05/01/2024
$49.03 $32.37 $81.40
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK
Footnote A below
ENGI0542-005
05/01/2024
$48.73 $32.28 $81.01
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (PO...POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS), AND MACNINES SIMILAR TO THE ABOVE
Footnote A below
ENGI0542-005
05/01/2024
$47.00 $31.78 $78.78
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK Footnote A below ENGI0542-005
05/01/2024
$46.02 $31.48 $77.50
STEAMFITTER (BUCKS, CHESTER, DELAWARE, MONTGOMERY AND PHILADELPHIA COUNTIES) PLUM0420-001
05/01/2025
$72.52 $44.58 $117.10
TRUCK DRIVER: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER) Footnote A, B, C below TEAM0107-002
05/01/2025
$37.42 $23.32 $60.74
TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS, FARM TRACTOR WHEN USED FOR TRANSPORTATION, STAKE BODY TRUCK (TANDEM) Footnote A, B, C below TEAM0107-002
05/01/2025
$37.52 $23.32 $60.84
TRUCK DRIVER: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT OR BELLY DUMP TRUCKS AND DOUBLE HITCHED EQUIPMENT, STADDLE (ROSS) CARRIER Footnote A, B, C below TEAM0107-002
05/01/2025
$37.77 $23.32 $61.09
Footnotes in PA20260004 (9)
  • CARP0255-006 A: PAID HOLIDAY: LABOR DAY
  • ENGI0542-005 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS
  • IRON0405-001 NOTE: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY
  • IRON0405-003 NOTE: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY
  • IRON0451-004 NOTE: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY
  • LABO0413-005 A: PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY
  • TEAM0107-002 A: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS.
  • TEAM0107-002 B: PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY.
  • TEAM0107-002 C: LOW BED TRAILERS SHALL BE PAID $0.50 HIGHER THAN THE HOURLY RATE FOR GROUP 2

Questions about these rates

What is the Davis-Bacon rate for electricians on highway work in Philadelphia County?
On WD PA20260004 Mod 8, published October 1, 2026, the row "ELECTRICIAN (CHESTER COUNTY (THE PORTION OF SADSBURY AND WEST SADSBURY TOWNSHIP NORTH OF U.S. HIGHWAY 30))" is $46.02 base plus $27.98 fringe, $74.00 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on highway work in Philadelphia County?
On WD PA20260004 Mod 8, published October 1, 2026, the row "PLUMBER" is $73.73 base plus $39.86 fringe, $113.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on highway work in Philadelphia County?
On WD PA20260004 Mod 8, published October 1, 2026, the row "CARPENTER" is $57.36 base plus $30.09 fringe, $87.45 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as highway construction?
Roads, streets, highways, runways, bridges, parking areas and related work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with PA20260004

Other counties: all Pennsylvania counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.