Davis-Bacon wage rates · Washington
Thurston County building construction wage rates
Federal prevailing wage rates for building construction in Thurston County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260116
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 51
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260116, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0001-015 06/01/2025 | $55.34 | $20.05 | $75.39 |
| CARPENTER (INCLUDES DRYWALL HANGER) | CARP0360-001 06/01/2025 | $63.98 | $19.13 | $83.11 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0528-009 06/01/2024 | $54.16 | $21.27 | $75.43 |
| DRYWALL FINISHER/TAPER | PAIN0364-001 07/01/2025 | $53.59 | $23.65 | $77.24 |
| ELECTRICIAN | ELEC0076-003 08/31/2025 | $65.14 | $26.56 | $91.70 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | ASBE0007-007 06/01/2025 | $75.37 | $18.82 | $94.19 |
| IRONWORKER | IRON0086-006 07/07/2025 | $57.94 | $34.52 | $92.46 |
| LABORER, MASON TENDER BRICK | LABO0252-017 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | LABO0242-011 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | SUWA2018-016 03/01/2024 | $42.25 | $0.00 | $42.25 |
| LABORER: COMMON OR GENERAL | SUWA2018-016 03/01/2024 | $38.17 | $6.88 | $45.05 |
| LABORER: CONCRETE SAW CHAIN | LABO0252-015 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: FIRE WATCH | LABO0335-007 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: FORM STRIPPING | LABO0242-015 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | LABO0242-017 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: HOD CARRIER | LABO0252-016 06/01/2025 | $53.99 | $17.05 | $71.04 |
| LABORER: JACKHAMMER | LABO0242-018 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | LABO0242-019 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | LABO0242-020 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | SUWA2018-016 03/01/2024 | $35.83 | $10.89 | $46.72 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | ENGI0612-011 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | ENGI0612-011 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | ENGI0612-011 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: BLADE FINISH | ENGI0612-021 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-016 03/01/2024 | $40.53 | $9.56 | $50.09 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | ENGI0612-021 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: CRANE (100 THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | ENGI0612-021 06/01/2025 | $61.81 | $27.32 | $89.13 |
| OPERATOR: CRANE (20 THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | ENGI0612-021 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | ENGI0612-021 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: DRILL | UAVGWA0002 03/01/2024 | $56.42 | $21.15 | $77.57 |
| OPERATOR: GRADER/BLADE | ENGI0612-021 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT IINCLUDING 8 YARD) | ENGI0612-021 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | ENGI0612-021 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: MECHANIC | SUWA2018-016 03/01/2024 | $45.17 | $19.20 | $64.37 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | ENGI0612-021 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | ENGI0612-021 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | ENGI0612-021 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | ENGI0612-021 06/01/2025 | $55.68 | $27.32 | $83.00 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | ENGI0612-021 06/01/2025 | $59.46 | $27.32 | $86.78 |
| PAINTER | PAIN0300-003 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | PLUM0026-015 06/01/2025 | $60.72 | $34.15 | $94.87 |
| PLASTERER | PLAS0528-010 06/01/2024 | $52.50 | $20.67 | $73.17 |
| PLUMBER | PLUM0026-018 06/01/2025 | $60.72 | $34.15 | $94.87 |
| POWER EQUIPMENT OPERATOR: DOZER (D-9 & UNDER) | ENGI0612-021 06/01/2025 | $59.46 | $27.32 | $86.78 |
| ROOFER | ROOF0153-003 02/01/2024 | $48.01 | $16.44 | $64.45 |
| SHEET METAL WORKER | SHEE0066-014 06/01/2025 | $69.86 | $33.39 | $103.25 |
| SPRINKLER FITTER | SFWA0699-004 07/01/2025 | $68.89 | $33.80 | $102.69 |
| TILE FINISHER | BRWA0001-013 06/01/2025 | $40.98 | $18.17 | $59.15 |
| TILE SETTER | BRWA0001-013 06/01/2025 | $49.70 | $18.62 | $68.32 |
| TRUCK DRIVER: CONCRETE TRUCK | TEAM0174-009 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK | SUWA2018-016 03/01/2024 | $46.71 | $8.58 | $55.29 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Thurston County?
What is the Davis-Bacon rate for plumbers on building work in Thurston County?
What is the Davis-Bacon rate for carpenters on building work in Thurston County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260116
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.