Davis-Bacon wage rates · Washington
Thurston County heavy construction wage rates
Federal prevailing wage rates for heavy construction in Thurston County, Washington, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260132
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 43
- Other types here
- Building, Residential, Highway
2 wage determinations cover heavy work in Thurston County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
1 of 2: WD WA20260132, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | CARP0360-003 06/01/2025 | $63.98 | $19.13 | $83.11 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0528-008 06/01/2024 | $54.16 | $21.27 | $75.43 |
| ELECTRICIAN | ELEC0046-002 08/04/2025 | $75.96 | $33.48 | $109.44 |
| FORM WORKER | SUWA2018-032 03/01/2024 | $48.26 | $14.59 | $62.85 |
| GRADE CHECKER | UAVGWA0014 03/01/2024 | $48.64 | $18.82 | $67.46 |
| IRONWORKER | IRON0086-005 07/07/2025 | $57.94 | $34.52 | $92.46 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | SUWA2018-032 03/01/2024 | $40.89 | $7.16 | $48.05 |
| LABORER: COMMON OR GENERAL | LABO0252-012 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: CONCRETE SAW CHAIN | SUWA2018-032 03/01/2024 | $36.41 | $10.89 | $47.30 |
| LABORER: FENCE ERECTOR | SUWA2018-032 03/01/2024 | $29.70 | $0.00 | $29.70 |
| LABORER: HOD CARRIER | SUWA2018-032 03/01/2024 | $38.58 | $10.89 | $49.47 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | LABO0242-009 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | LABO0242-010 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | LABO0252-013 06/01/2025 | $51.52 | $16.99 | $68.51 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | ENGI0612-003 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | ENGI0612-003 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | ENGI0612-003 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-032 03/01/2024 | $51.50 | $0.00 | $51.50 |
| OPERATOR: BULLDOZER | ENGI0612-004 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: CONCRETE PUMP (MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE) | ENGI0612-024 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | ENGI0612-024 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M) | ENGI0612-024 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: CRANE | UAVGWA0018 03/01/2024 | $55.86 | $25.30 | $81.16 |
| OPERATOR: DRILL (DRILLING MACHINE) | ENGI0612-024 06/01/2025 | $61.81 | $27.32 | $89.13 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | ENGI0612-024 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | ENGI0612-024 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: FORKLIFT | SUWA2018-032 03/01/2024 | $49.89 | $0.00 | $49.89 |
| OPERATOR: GRADER/BLADE | ENGI0612-024 06/01/2025 | $60.91 | $27.32 | $88.23 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS; PLANT FEED) | ENGI0612-006 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: MECHANIC | SUWA2018-032 03/01/2024 | $53.10 | $4.41 | $57.51 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | ENGI0612-024 06/01/2025 | $60.14 | $27.32 | $87.46 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | ENGI0612-024 06/01/2025 | $59.46 | $27.32 | $86.78 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUWA2018-032 03/01/2024 | $32.35 | $13.44 | $45.79 |
| OPERATOR: ROLLER | SUWA2018-032 03/01/2024 | $44.66 | $13.93 | $58.59 |
| OPERATOR: SCRAPER | ENGI0612-024 06/01/2025 | $60.14 | $27.32 | $87.46 |
| PAINTER | PAIN0300-002 07/01/2025 | $41.24 | $14.70 | $55.94 |
| TRAFFIC CONTROL: FLAGGER | LABO0252-014 06/01/2025 | $40.88 | $16.72 | $57.60 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | UAVGWA0015 03/01/2024 | $39.00 | $14.40 | $53.40 |
| TREE TRIMMER | ELEC0077-003 02/01/2023 | $42.57 | $17.97 | $60.54 |
| TREE TRIMMER: GROUND PERSON | ELEC0077-003 02/01/2023 | $22.60 | $16.37 | $38.97 |
| TRUCK DRIVER: ASPHALT MIX | TEAM0313-001 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK | SUWA2018-032 03/01/2024 | $27.32 | $12.50 | $39.82 |
| TRUCK DRIVER: WATER TRUCK | SUWA2018-032 03/01/2024 | $31.62 | $16.84 | $48.46 |
2 of 2: WD WA20260080, Mod 1
Make a WH-347 with these ratesScope as published: Dredging Construction Projects (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| DREDGING: ASSISTANT ENGINEER ZONE A | ENGI0701-003 01/01/2024 | $53.31 | $16.70 | $70.01 |
| DREDGING: ASSISTANT ENGINEER ZONE B | ENGI0701-003 01/01/2024 | $56.31 | $16.70 | $73.01 |
| DREDGING: ASSISTANT ENGINEER ZONE C | ENGI0701-003 01/01/2024 | $59.31 | $16.70 | $76.01 |
| DREDGING: ASSISTANT MATE ZONE A | ENGI0701-003 01/01/2024 | $47.95 | $16.70 | $64.65 |
| DREDGING: ASSISTANT MATE ZONE B | ENGI0701-003 01/01/2024 | $50.95 | $16.70 | $67.65 |
| DREDGING: ASSISTANT MATE ZONE C | ENGI0701-003 01/01/2024 | $53.95 | $16.70 | $70.65 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A | ENGI0701-003 01/01/2024 | $56.47 | $16.70 | $73.17 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B | ENGI0701-003 01/01/2024 | $59.47 | $16.70 | $76.17 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C | ENGI0701-003 01/01/2024 | $62.47 | $16.70 | $79.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE A | ENGI0701-003 01/01/2024 | $56.47 | $16.70 | $73.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE B | ENGI0701-003 01/01/2024 | $59.47 | $16.70 | $76.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE C | ENGI0701-003 01/01/2024 | $62.47 | $16.70 | $79.17 |
| DREDGING: TENDERMAN ZONE A | ENGI0701-003 01/01/2024 | $51.82 | $16.70 | $68.52 |
| DREDGING: TENDERMAN ZONE B | ENGI0701-003 01/01/2024 | $54.82 | $16.70 | $71.52 |
| DREDGING: TENDERMAN ZONE C | ENGI0701-003 01/01/2024 | $57.82 | $16.70 | $74.52 |
DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $35.93 | $17.40 | $53.33 |
DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF T...DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $36.93 | $17.40 | $54.33 |
DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HAR...DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $37.35 | $17.40 | $54.75 |
DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $38.39 | $17.40 | $55.79 |
DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANO...DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $36.93 | $17.40 | $54.33 |
DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WES...DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $37.35 | $17.40 | $54.75 |
HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $29.76 | $20.65 | $50.41 |
HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.08 | $20.65 | $50.73 |
HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.69 | $20.65 | $51.34 |
HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.85 | $20.65 | $51.50 |
HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.01 | $20.65 | $51.66 |
HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.29 | $20.65 | $51.94 |
HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.56 | $20.65 | $52.21 |
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE ...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $60.63 | $27.32 | $87.95 |
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 T...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $60.63 | $27.32 | $87.95 |
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILE...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $62.32 | $27.32 | $89.64 |
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZON...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $62.32 | $27.32 | $89.64 |
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS ...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $64.11 | $27.32 | $91.43 |
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $64.11 | $27.32 | $91.43 |
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 ...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $59.96 | $27.32 | $87.28 |
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) -...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $59.96 | $27.32 | $87.28 |
Questions about these rates
What is the Davis-Bacon rate for electricians on heavy work in Thurston County?
What is the Davis-Bacon rate for carpenters on heavy work in Thurston County?
What is the Davis-Bacon rate for laborers on heavy work in Thurston County?
Which wage determination applies to my project?
What counts as heavy construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260132
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.